Infrastructure Strategy
Workload, power and cooling assessed before the first rack is ordered — so the architecture scales without rework.
Cluster sizing, power and cooling envelopes, fabric selection and storage topology are decided up front and written down. The plan is what the deployment team builds against, and what the operations team inherits.
What the engagement covers
Workload profiling and cluster sizing
Power and cooling envelope per rack
Network fabric selection — InfiniBand or RoCEv2 / RDMA
Storage and interconnect topology
Four phases, planning to production
Requirements gathering, data centre readiness assessment and infrastructure preparation.
Rack mounting, cabling, operating system installation, driver and firmware updates.
Software configuration, network setup, integration testing and load testing.
Ongoing L1 data centre operations, RMA management and 24×7 SLA-driven incident response.
The rest of the lifecycle
Deployment & Integration
Rack mount, structured cabling, OS and driver provisioning, network configuration — delivered through a structured four-phase model with a single point of contact.
ConnectStructured Cabling
Certified cabling engineers deliver structured cabling engineered for GPU cluster performance — fibre testing, cable management and complete documentation included.
Ready to deploy your AI infrastructure?
Tell us the rack count and the date it has to be live. Our project managers in Taiwan, Singapore, Malaysia and Indonesia take it from there.