Plan

Infrastructure Strategy

Workload, power and cooling assessed before the first rack is ordered — so the architecture scales without rework.

Cluster sizing, power and cooling envelopes, fabric selection and storage topology are decided up front and written down. The plan is what the deployment team builds against, and what the operations team inherits.

Scope

What the engagement covers

01

Workload profiling and cluster sizing

02

Power and cooling envelope per rack

03

Network fabric selection — InfiniBand or RoCEv2 / RDMA

04

Storage and interconnect topology

How we deliver

Four phases, planning to production

Phase 01

Requirements gathering, data centre readiness assessment and infrastructure preparation.

Phase 02

Rack mounting, cabling, operating system installation, driver and firmware updates.

Phase 03

Software configuration, network setup, integration testing and load testing.

Phase 04

Ongoing L1 data centre operations, RMA management and 24×7 SLA-driven incident response.

Get started

Ready to deploy your AI infrastructure?

Tell us the rack count and the date it has to be live. Our project managers in Taiwan, Singapore, Malaysia and Indonesia take it from there.

Talk to our team →